彩钢活动房的安装方法 |
添加时间:2017/12/20 14:08:39 浏览次数: |
彩钢活动板房与建楼房差不多,将四周及隔墙基础找平,最好用钢筋混凝土,比较结实;然后立柱子,用横向梁将骨架连起来,上隔板、外墙板与门窗框;跟着铺地板,再向上安上一层,然后上屋架和屋面板;最后安装门窗等,拉竖向支撑。还有就是卫生洁具啊、小五金之类的。 其实这种就是轻钢结构,与重钢结构厂房很类似 彩钢活动房隐蔽工程是指在施工过程中,完成上一道工序后,将被下一道工序所掩盖,全部完工后无法进行检查的部位,做居室装修,“隐蔽工程”是关键,如果“隐蔽工程”没有做好,表面装饰得再漂亮,也是徒劳。 “隐蔽工程”可分为水安装、电安装及防潮、防水等项目。其中的每一个项目都不容忽视,如果哪一个环节出了问题,都可能带来严重的经济损失,甚至对人身安全带来伤害。防水工程的施工工艺和材料识别,避免不必要的经济损失和伤害。 The panel room of the colored steel activity is similar to the building of the building, and the four sides and the wall of the wall are leveling, which is better to use reinforced concrete. Then stand the pillar, and use transverse beam to connect the skeleton, the partition board, the outer wall panel and the door window frame; Follow the floor, then up a layer, then upper the roof and the roof board; Finally install window and so on, pull vertical support. There are sanitary ware, hardware and so on. In fact this is the light steel structure, similar to chongqing steel structure workshop is caigang trailer take cover engineering refers to the construction process, after completion of the procedure will be covered next procedure, after the completion of the whole to check parts, make a bedroom to decorate, "take cover engineering" is the key, if not yet ready to "take cover engineering", the surface decorated again beautiful, also is in vain. "Concealed works" can be divided into water installation, electric installation and moisture-proof, waterproof and other projects. Each of these projects should not be overlooked, and if any one of them goes wrong, it can lead to serious economic losses and even harm to personal safety. The construction process and material identification of waterproofing works avoid unnecessary economic loss and injury. |
上一页 钢结构屋面漏水的原因及防治措施 |
下一页 彩钢房种类 |
Copyright © 技术支持:遨游网络