钢结构工程施工准备 |
添加时间:2021/7/14 9:40:54 浏览次数: |
钢结构工程施工准备 Construction preparation of steel structure engineering 施工准备是建设施工创造必须条件,认真、细致、深入地做好施工准备工作,对充分发挥人的积极因素,合理组织人力、物力,加快工程进度,提供施工质量,节约投资和材料,对顺利完成钢结构建设任务起着重要的作用。 Construction preparation is a necessary condition for construction. It plays an important role in giving full play to people's positive factors, reasonably organizing human and material resources, accelerating project progress, providing construction quality, saving investment and materials, and successfully completing the task of steel structure construction. 1.1认真做好施工图纸的会审和交底工作 1.1 do a good job in joint review and disclosure of construction drawings 图纸是工程施工的依据,工程项目技术负责人应组织有关技术人员对图纸进行分工审阅和消化,其目的一是使施工单位和各参建单位熟悉设计图纸,了解工程特点和设计意图,找出需要解决的技术难题,并制定解决方案;二是为了解决图纸中存在的问题,减少图纸的差错,将图纸中的质量隐患消灭在萌芽之中。同时做好技术交底,做好施工和设计的结合、做好钢结构吊装与土建施工、钢结构和混凝土构预制的结合。 The drawings are the basis of engineering construction. The technical director of engineering project shall organize relevant technical personnel to review and digest the drawings. The first purpose is to make the construction units and participating units familiar with the design drawings, understand the engineering characteristics and design intent, find out the technical problems to be solved, and formulate solutions; Second, in order to solve the problems existing in the drawings, reduce the errors in the drawings, and eliminate the hidden quality problems in the drawings in the bud. At the same time, do a good job in technical disclosure, do a good job in the combination of construction and design, do a good job in the combination of steel structure hoisting and civil construction, steel structure and concrete structure prefabrication. 1.2认真编制钢结构工程施工组织设计流水槽钢模具 不锈钢铸件 扭王字块模具 井盖钢模具 标志桩模具 调匝式消弧线圈 风冷控制柜 烤漆龙骨 1.2 carefully prepare the construction organization design of steel structure engineering 施工组织设计是施工单位编制的指导工程施工全过程各项活动的重要综合性技术文件,是一个科学的管理方法。施工单位在编制施工组织和施工方案时,须从人、机、料、法、环五个方面制定切实可行的具体实施细则,落实计划,落实组织人员,落实自检、互检和专检,把容易出现的质量问题全部纳入受控状态,确保方案技术措施得力、可行。在编制和贯彻施工组织设计过程中应做到广泛深入的研究,向施工人员交底,做到人人把关。钢结构工程要针对制作阶段和安装阶段分别编制制作工艺和安装施工组织设计。其中制作工艺内容应包括制作阶段各工序、各分项的质量标准、技术要求,以及为保证产品质量而制订的各项具体措施。钢结构安装工程施工组织设计内容有质量保证体系和技术管理体系的建立、质量、进度控制的措施和方法、施工工期的安排等。 Construction organization design is an important comprehensive technical document prepared by the construction unit to guide the whole process of engineering construction, and it is a scientific management method. When preparing the construction organization and construction scheme, the construction unit shall formulate practical and feasible specific implementation rules from the five aspects of human, machine, material, method and environment, implement the plan, organize personnel, implement self inspection, mutual inspection and special inspection, and bring all the quality problems that are easy to appear into the controlled state, so as to ensure the effectiveness and feasibility of the scheme and technical measures. In the process of compiling and implementing the construction organization design, we should do extensive and in-depth research, disclose to the construction personnel, and ensure that everyone checks. For steel structure engineering, the production process and installation construction organization design should be prepared respectively for the production stage and installation stage. The production process should include the quality standards and technical requirements of each process and item in the production stage, as well as the specific measures formulated to ensure the product quality. The construction organization design of steel structure installation engineering includes the establishment of quality assurance system and technical management system, the measures and methods of quality and progress control, and the arrangement of construction period. |
上一页 目前厂房屋面材料以各类彩钢瓦为主 |
下一页 活动板房请不要在室内使用明火炉具 |
Copyright © 技术支持:遨游网络