活动房的保养 |
添加时间:2017/5/8 16:23:11 浏览次数: |
第一、在判定要建造活动板房之后,首要你有必要需要厂家的专业人员最好是做工程建筑的去调查场所。 First, after deciding to build the mobile home, the first thing you need to do is to do the engineering building to investigate the site.
充分了解自然环境,了解地质情况,了解周边环境,了解在地的气候。如每年的降雨量,能否会有劲风,能否有泥石流等。调查场所这一步是很重要的,除了量好场所的标准,更重要的是要了解自然环境,拟定活动板房的地基方案,判定活动板房的屋顶、骨架、墙体能否需要加强、加固。这直接影响往后活动板房运用的质量和寿数,这往后也没办法去抵偿。 Fully understand the natural environment, know the geology, understand the surrounding environment, and understand the climate of the ground. If annual rainfall, can have strong wind, can have mudslides and so on. Survey places this step is very important, in addition to the amount of the standard of the good place, more important is to understand the natural environment, proposed the foundation scheme of prefabricated houses, can determine the roof of the prefabricated houses, frame, wall body needs strengthening and reinforcement. This directly affects the quality and the number of days that the active panel USES, and there is no way to compensate for it.
第二、活动板房设备无缺后,用户不得私行更改板房的规划,不可以拆开任何螺栓构件。 Second, after the activity board room equipment is intact, the user is not allowed to change the plan of the plank house privately, can not open any bolt member.
板房的骨架是一个整体,整体的有些一旦出现问题,便会发生连锁效应。如要增加或减少隔墙,应先与制造厂家联络,取得他们的定见与板房资料,再自行联络厂家。活动板房系轻钢规划件整栋联接,用户安顿用电路时,电线电缆不能直接绑扎在板房钢规划上,应设线管或线槽隔绝设备,防止发生触电。2年多后,轻钢规划件的外表油漆会老化、坠落,此时应当从头涂漆,以坚持钢规划件的运用寿数,防止过多生锈老化。 The skeleton of the panel is a whole, and the whole thing has a knock-on effect if there is a problem. If want to increase or reduce partition wall, should first contact with manufacturer manufacturer, obtain their order to see and the panel room data, again self-contact manufacturer. Department of prefabricated houses in light steel planning a whole building connection, users settled with circuit, wire and cable can not directly binding on precise steel planning, should set line pipe or trough isolation device, prevent to get an electric shock. After more than 2 years, light steel planning a fall, the appearance of the paint will be aging, at this time should be from the painting, to insist on the use of steel planning a life spans, prevent excessive rust aging.
第三、突发事件处置。 Third, emergency disposal.
暴雨前,应当做好活动板房周围的排水处置作业,如果雨水过多进入板房室内、墙体底部,这必将影响活动板房的寿数。特大飓风来临前,应联络制造厂家,让他们加固屋顶,在板房邻近栓上“揽风绳”或其他有用固定物件! Storm before, shall do a prefabricated houses around the drainage disposal operations, if too much rain to enter indoor, the bottom of the wall, this will affect the prefabricated housing life spans. Before the big hurricane comes, the manufacturer should be contacted to reinforce the roof and "wind rope" or other useful fixture on the adjacent side of the boardhouse. |
上一页 钢结构质量验收标准 |
下一页 彩钢房的安装方法 |
Copyright © 技术支持:遨游网络